Jinan ACME MW1070 MPCVD Machine |
Vacuum |
Vacuum measurement |
Piezoresistive gauge 0.1-100kpa Capacitance gauge 0-1000Pa |
Operating pressure range |
4-28Kpa |
Vacuum leakage rate |
≤ 5 * 10-9Pa.M3/S (He leak detection) |
Pressure control |
Auto-Control |
Cavity material |
Aluminum alloy excitation chamber, quartz vacuum chamber |
Observation window |
Temperature measuring hole with diameter of 10mm and observation window of porous hole |
Cooling mode |
Cooling mode |
Water cooling+chamber air cooling |
Sample table size |
Molybdenum stage Φ 70mm, uniform area Φ 50mm |
Temperature measurement |
Infrared thermometer, range 300-1400 ºC |
Cooling water flow |
>50L/min |
Cooling water temperature |
20-22ºC |
Cooling water interface |
1-inch outer wire interface |
Operating system |
Operating system |
PLC control, 15 inch touch screen control |
Process Menu |
10 process menus, 25 lines for each |
Microwave and power supply |
Microwave frequency |
2.45±0.1GHz |
Output power |
1.5-7.5Kw (equipped with 10kw domestic microwave power supply) |
Input power electricity |
380 Ac/50Hz, three-phase five wire (3 * 10+2 * 6 power line),>15Kw |
Microwave leakage rate |
Microwave leakage rate 5cm away from the equipment ≤ 5Mw/cm2 |
Process gas |
Flowmeter and interface |
H2 (1000SCCM) CH4 (50SCCM) N2 (10SCCM) O2 (10SCCM) 1/4 "VCR female compressed air 8mm Pu tube quick plug |
The flowmeter can change the type of gas used through software |
Air supply pressure |
0.3-0.35MPa |
Compressed air pressure |
0.5-0.6MPa |
Vacuum pump |
Rotary vane vacuum pump |
Oil pump |
Pumping speed |
4L/S |
Power supply |
Ac 380V(±10%) |
Interface |
Air extraction KF25, air exhaust KF25 |
Operating environment |
Ambient temperature and humidity |
The room temperature is lower than 26 ºC and the humidity is lower than 40% |
Overall dimensions of equipment |
Size |
1250(L)×800(W)×2100(H)mm |
Equipment appearance |
|
|
Equipment acceptance conditions: |
1. Equipment installation: After the equipment installation is completed, Party A and Party B shall conduct on-site commissioning, and Party B's technicians shall conduct equipment operation, safety and maintenance training for the person in charge of Party A. |
2. System test: The system can be started and operated normally, and the detached fireball is stable without jumping. |
3. Microwave leakage: the microwave leakage is less than 5mW/cm2 (the output power of the microwave source is more than 80%, 10cm away from the equipment) |